Discover every space of the new Puertos Campus before its doors open.
- 2028
- Opening
- 400
- Students
- 3
- Levels
- 100%
- Bilingual
Spaces
Early years: classrooms, playground and multipurpose room.
Classrooms on two levels, labs and terrace.
Entrance hall, dining hall and gym.
Second stage of the project.
How to navigate
Tap a space to enter its 360° tour. The button above switches floors.
Book an interview